PVD Modular IS Head Tube: Difference between revisions

From Pvdwiki
Jump to navigationJump to search
No edit summary
No edit summary
 
Line 1: Line 1:
==Intent==
==Intent==
Machining head tubes from one peice has gotten really old. Plus, My current road bike needed a head tube too long for the process. A better way has to exist.
==Process==
==Process==
*Press fit parts
*Press fit parts
Line 9: Line 10:
[[Image:New-IS-2.jpg]]<br><br>
[[Image:New-IS-2.jpg]]<br><br>
[[Image:New-IS-3.jpg]]<br><br>
[[Image:New-IS-3.jpg]]<br><br>
[[Image:New-IS-4.jpg]]<br><br>
[[Image:New-IS-4.jpg]]<br><br>The full system with Cane Creek 110 headset in place. Crazy light.<br>
[[Image:New-IS-5.jpg]]<br><br>
[[Image:New-IS-5.jpg]]<br><br>
The full system with Cane Creek 110 headset in place. Crazy light.
 
[[Image:New-IS-6.jpg]]<br><br>
 
==Oops!==
==Oops!==
Ruined a bearing by mistake during test fitting. Can't let that happen again.<br>
Ruined a bearing by mistake during test fitting. Can't let that happen again.<br>
[[Image:New-IS-7.jpg]]<br><br>
[[Image:New-IS-6.jpg]]<br><br>





Latest revision as of 21:34, 25 March 2008

Intent

Machining head tubes from one peice has gotten really old. Plus, My current road bike needed a head tube too long for the process. A better way has to exist.

Process

  • Press fit parts
  • Clamp together during welding with copper heat sinks
  • Silver braze fillet post weld.

Weigh In









The full system with Cane Creek 110 headset in place. Crazy light.



Oops!

Ruined a bearing by mistake during test fitting. Can't let that happen again.