Difference between revisions of "PVD 5.5" Fork Hardtail Aluminum"

From Pvdwiki
Jump to: navigation, search
(Heat Treating)
(Heat Treating)
Line 46: Line 46:
  
 
==Welded Up==
 
==Welded Up==
==Heat Treating==
+
==Ageing - Heat Treating==
  
"AGEING
+
===Columbus===
Frames in 7000 alloy. The ageing of the frame realized in 7000 alloy has to be carried out 4/5 days after the welding, in two phases: 6 hours at 90°C ±5° - 4 hours at 150°C ±5°." Columbus.
+
Frames in 7000 alloy.<br>
 +
The ageing of the frame realized in 7000 alloy has to be carried out 4/5 days after the welding, in two phases: 6 hours at 90°C ±5° - 4 hours at 150°C ±5°.
 +
 
 +
===Easton===
 +
Artificial age for 7005 frames:<br>
 +
Age 6 hours at 200 degrees F (± 10 degrees F) plus 4 hours at 320 degrees F (±10 degrees F). This process
 +
must be performed by the builder on all Easton 7005 tube sets.
  
 
==Paint==
 
==Paint==

Revision as of 16:37, 24 November 2007

This is going to be my first aluminum bike, so I have a few details to work out.

Geometry

Pete's-26-inch-R2.gif


Tubeset

Easton Ultra-Lite 7005 Taperwall MTB tubeset

7005 Aluminum Stock

This tubing is widely available as special bicycle tubing, but is rare to find as bulk straight gauge tube.

One source is Fairing, Full 2008 Catalog

Odd Parts

Ahrens is selling some quality parts, the dropouts look very nice.

Head Tube and Headset

Custom Head tube

Cane Creek ZS-2

  • Upper Stack - 8mm
  • Lower Stack - 5.6mm

Fabrication Instructions

Easton Fabrication Instructions 7005 & 6061

Welding Rod

"Use 5356, 5180 or 5183 fillers for welding 7005 frames.", Easton. "5356/5180/5183" Columbus

"Al Mg Si 05 (USA 6063) - CASTO MAG 45802" CeeWay.

Welded Up

Ageing - Heat Treating

Columbus

Frames in 7000 alloy.
The ageing of the frame realized in 7000 alloy has to be carried out 4/5 days after the welding, in two phases: 6 hours at 90°C ±5° - 4 hours at 150°C ±5°.

Easton

Artificial age for 7005 frames:
Age 6 hours at 200 degrees F (± 10 degrees F) plus 4 hours at 320 degrees F (±10 degrees F). This process must be performed by the builder on all Easton 7005 tube sets.

Paint

Complete Bike

Ride Quality